NHS IP5 – Battery Storage System

Battery Storage Installation – NHS IP5 Facility, South Wales

EFS Systems (UK) Ltd delivered a large-scale battery storage installation at the NHS IP5 Facility, enhancing the site’s renewable energy infrastructure and supporting improved energy management and resilience.

Building on the existing 301kWp Solar PV system, EFS Systems installed a 50kW / 100kWh AC-coupled battery storage system, enabling the facility to store excess renewable energy for use during peak demand periods or reduced solar generation. This integrated approach improves energy efficiency, reduces reliance on grid electricity and maximises the utilisation of on-site renewable generation.

Acting as principal contractor, EFS Systems delivered the full scope of works, including electrical installations, civil works and system integration. The project also incorporated detailed site investigations, including topographical surveys and ground penetrating radar (GPR) surveys, ensuring safe and effective installation.

As part of the wider infrastructure upgrade, a 630A electrical supply and GRP kiosk were installed to support both the Solar PV and battery storage systems, providing a robust and future-proof solution capable of accommodating additional technologies such as EV charging infrastructure.

All works were carried out within a live healthcare environment, requiring careful planning and coordination to ensure minimal disruption to operations. The system was fully integrated with the site’s existing electrical infrastructure, delivering reliable, flexible and efficient energy management.

The project was recognised for its innovation and impact, being shortlisted for the Climate Action Award at the 2025 Constructing Excellence Wales Awards.

This project demonstrates EFS Systems’ capability to deliver advanced energy storage solutions as part of complex renewable energy systems, supporting critical public sector facilities with future-ready infrastructure.