Abertillery Sports Centre – Solar PV & Battery Storage

Solar PV & Battery Storage Installation – Abertillery Sports Centre, South Wales
EFS Systems (UK) Ltd successfully delivered a large-scale Solar PV and battery storage installation at Abertillery Sports Centre, supporting the facility’s transition towards sustainable and energy-efficient operation.
The project comprised a 196.83kWp Solar PV system, installed using 486 x 405W high-efficiency modules, designed to maximise on-site renewable energy generation and improve overall energy performance.
In addition to the solar array, a 20.4kWh battery storage system was installed, enabling the site to store excess energy generated during peak daylight hours for use during periods of higher demand or reduced generation. This integrated approach optimises energy usage, reduces reliance on grid electricity and improves overall energy resilience.
The system was carefully designed to suit site conditions and energy consumption patterns, ensuring optimal performance and long-term reliability. All associated electrical works, including inverters, cabling and full system integration, were completed in accordance with current regulations and industry standards.
The completed installation delivers measurable reductions in energy costs and carbon emissions, supporting the sports centre’s long-term sustainability objectives.
This project demonstrates EFS Systems’ expertise in delivering large-scale renewable energy systems, combining Solar PV and battery storage technologies to create efficient, future-ready solutions for public sector facilities.
Key Details
- Location: Abertillery Sports Centre, South Wales
- Sector: Public Sector / Sports & Leisure / Renewable Energy
- Project Type :Solar PV & Battery Storage Installation
- Scope of Works :96.83kWp Solar PV, Battery Storage, Electrical Integration
- Client Type:Public Sector Leisure Facility